Anti Rust Marine Paint Alkyd Primer

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-08-18 13:40

  • Browse the number:

    307

Send an inquiries
Company Profile
Huisins New Material Technology Co.,Limited
Contactaixin:

huisins(Mr.)  

Email:

telephone:

phone:

Arrea:

Beijing

Address:

Room 214 2F No.149-2 Huangpu AVE Middle, TianHe District, Guangzhou City, China

Website:

http://www.huisinschem.com/ http://www.lektrix.net/com/huisins/

Product details

Technical Specification

Product Name: Alkyd FInish

Model Name: 725-C43-1

Product Description

1. A quick drying single pack alkyd deck paint

2. VOC is 450 g/L

Intended Uses

1. A cosmetic finish

2. For use in steel bridge of water areas

3. For use in steel frame of road and bridge

Product Information
1. Volume Solids  46%±3%
2. Finish/Sheen Seim-Gloss
3. Typical Film Thickness 40 microns dry ( 100 microns wet)
4. Theoretical Coverage: 11.5㎡/L at typical film thickness
5. Mix Ratio: one pack
6. Method of Application
    Airless Spray Tip size range 0.38-0.53mm
    Output Pressure ≥17MPa
    Air Spray Tip size range 2-3mm
    Output Pressure ≥0.4MPa
    Brush/Roller Need to coat several times to get film thickness
7. Thinner: Not recommended .Use water only in exceptional circumstances(max 5% by volume)
8. Drying Information
    -5°C 5°C 25°C  35°C
    Touch Dry  2H 1H 30min  15min
    Hard  Dry 24H  20H 12H 8H
    Pot Life  Not applicable
    Overcoatings Data:  Substrate Temperature
    Overcoated By
    -5°C 5°C  25°C  35°C
    Min Max  Min Max  Min Max Min Max
    48H no 36H no  24H no 24H no
9. Storage: Store in cool and dry conditions, Well ventilate. Keep away from hot and fire.Store temperature should be higher than 0°C.
    Shelf Life: 12Months minimum at 25°C, Subject to re-inspection thereafter.
10. Pack Size: 22kg/18L in 20L container

Surface Preparation:
1. High pressure fresh water wash or fresh water wash, as appropriate, and remove all oil or grease, soluble contaminants and other foreign matter in accordance with SSPC-SP1 solvent cleaning. All surfaces to be coated should be clean, dry and free from contamination.
2. Newbuilding/Major Refurbishment

725-C43-1 should be applied over a recommended primer coating scheme. The primer surface should be clean, dry and free from contamination. 725-C43-1 must be applied within the coating interval specified (consult the relevant and free from contamination. 725-C43-1 must be applied within the coating interval specified (consult the relevant product data sheet). Areas of breakdown, damage etc. Should be prepared to the specified standard (eg.St3) and primed prior to the application of 725-C43-1.
3. Repair/On Board Maintenance

725-C43-1 should be applied over a recommended primer coating scheme. The primer surface should be clean, dry and free from contamination. 725-C43-1 must be applied within the coating interval specified (consult the relevant and free from contamination. 725-C43-1 must be applied within the coating interval specified(consult the relevant product data sheet). Areas of breakdown, damage etc. Should be prepared to the specified standard (eg.St3) and primed prior to the application of 725-C43-1.

725-C43-1 Maybe applied directly over aged 725-C43-1 following thorough fresh water washing and degreasing provided the coating to be overcoated is in intact and tightly adherent condition. Loose or flaking coatings should be removed back to a firm edge and an appropriate primer should be used to repair the area before application of the full coat.

Limitations

a. Apply in good weather, Temperature of the surface to be coated must be least 3°C above the dew point when the humidity is lower than 85%

b. The dry time and over coating interval may change according to the environment factors.

c. Forbid to trample or pullute the surface of AF3-1 and coat the next paint before the film is hard dry.


http://www.huisinschem.com/